Print Page icon Text Resize icon

Power and Water East Point Rising Main

The duplication of the Effluent Rising Main (ERM) at East Point is to accommodate an increase in effluent flows generated by the diversion of sewage from the Larrakeyah catchment to Ludmilla and projected population growth to 2030 in the combined sewerage ‘catchment’ (this includes the Darwin city, Larrakeyah and Ludmilla catchment areas).

The Assessment Report completed by the NT Environment Protection Authority is available to be downloaded below.

Asessment Report: Power and Water East Point Effluent Rising Main

preloading background image